De Kock BV realized the complete HVAC installation that provides the entire building with heating and sanitary hot water through a main boiler room and 2 substations where 5 decentralized boilers and 3 condensing gas boilers were placed.
In addition, 9 ventilation groups were installed. Three of these groups are equipped with a heating and cooling battery to separately supply the special isolation rooms with the required temperature and ventilation. Optimal operation of the entire plant is maintained through automatic control.
[ngg src=”galleries” ids=”5″ display=”basic_thumbnail” thumbnail_crop=”0″]